Australia funds hydrogen pilot for steel manufacturing

Australia’s renewable energy agency announced A$15 million for Hadean Energy on 5 November 2026. The planned Victorian pilot will test whether its hydrogen technology can serve steel manufacturing.
A pilot linked to steel production
The A$30 million project would build and operate a 200–300 kW hydrogen pilot plant in Victoria, subject to final deployment arrangements and approvals. Hydrogen produced there is intended for an annealing process at another industrial facility. ARENA expects output of up to 7 kilograms an hour, enough to meet about 85% of that process’s hydrogen demand. Annealing uses controlled heating and cooling to change the properties of steel.
Testing performance with industrial heat
Hadean’s tubular solid oxide electrolyser grew out of CSIRO research. It uses electricity to split heated steam to produce hydrogen. The project aims to use waste heat from an existing industrial process if feasible. Hadean estimates that, with process heat, the technology could use up to 30% less electricity than conventional electrolysers. Operation at the industrial site will test its performance and commercial potential.