AITMONDO

NVIDIA’s manufacturing chief explains the supply chain behind AI equipment

White factory buildings line an intersection under a blue sky, with large pieces of equipment on the roof of the building at left.
File photo taken on May 27, 2025. TSMC’s Fab 18 semiconductor plant at the Southern Taiwan Science Park in Taiwan. 4300streetcar / CC BY 4.0. Resized and converted to WebP.

On November 18, NVIDIA Japan published an interview with Deb Shoquist, who oversees manufacturing and the supply chain at NVIDIA. She explained what the company requires of its suppliers to take semiconductor designs into mass production and how it adjusts production by tracking chips individually.

Shoquist meets major suppliers quarterly and visits partners six weeks a year. She said tracking chips and adjusting allocations cut the time from chip to system shipment from five weeks to two when needed.
AITMONDO graphic based on primary sources.

Suppliers need financial strength, technical capability and a willingness to try new approaches

Shoquist said NVIDIA looks for suppliers with the financial strength to invest in ramping up production, the technical ability to meet precise design requirements and the willingness to try new manufacturing methods. She said she meets with major suppliers quarterly and spends six weeks a year visiting partners in Taiwan, China, South Korea, Vietnam and the United States.

Tracking individual chips can shorten the time to shipment

According to Shoquist, NVIDIA tracks each chip from the identification number on its die through to the customer invoice. The company reviews each factory’s yield and processing time weekly. If a factory falls short of its standards, NVIDIA allocates no additional chips to that factory for the week. Shoquist said the system made it possible to cut the time from TSMC shipping chips to Foxconn and Wistron shipping systems from five weeks to two when supply and demand called for it.

The team redesigned final testing before the GB200 production ramp

As Foxconn and Wistron prepared to mass-produce NVIDIA GB200 computing boards, the throughput of automated final testing fell short of plan. Shoquist said production continued by returning to manual loading of the boards into the test equipment. NVIDIA’s design, production engineering and testing teams worked with Foxconn’s automation engineering team to redesign and restart the line before production ramped up substantially.

Primary sources